Moel Rhos

A 16mm scale narrow gauge railway in a West Wales garden…

Month: August 2018

  • A Cab for Konrad (3)

    Between last autumn and this spring I put together the cab for my Regner Konrad (see my posts on designing, and cutting and beginning assembly of the cab). This post brings progress up to date – there are several finishing touches still needed, and paint – but at the time of writing I have at…

  • A Cab for Konrad (2)

    With a clearer idea of the cab I wanted to build, I started out (under the expert supervision of Mr Tony Bird) cutting pieces from 1mm brass sheet.

  • 3rd Tunnel

    The next civil engineering project in extending towards the shed was a further tunnel.

  • A Cab for Konrad (1)

    It’s been over a year and a half since I last posted on here, on the occasion of acquiring for the Moel Rhos a second steamer, a Regner Konrad.